Don’t Dismiss Stage 4 of an SIS Functional Safety Assessment!
The 2nd edition of IEC 61511 now requires – by use of the word “shall” – that a Stage 4 Functional Safety Assessment (FSA) be conducted...


Linking PSM, NFPA, and ISA/IEC 61511 for Fired Equipment: The Wynnewood Refining Co. Case
OSHA contended that the boiler was interconnected to a covered process through the refinery fuel gas system and steam header. The 10th Circu


Lessons Learned on SIL Verification and SIS Conceptual Design
by Richard E. Hanner & aeSolutions Technical Team There are many critical activities and decisions that take place prior to and during the Safety Integrity Level (SIL) Verification and other Conceptual Design phases of projects conforming to ISA84 & ISA/IEC 61511. These activities and decisions introduce either opportunities to optimize, or obstacles that impede project flow, depending when and how these decisions are managed. Implementing Safety Instrumented System (SIS) pr


Burner Management System Safety Integrity Level Selection
by aeSolutions Technical Team This paper will discuss how quantitative methods can be utilized to select the appropriate Safety Integrity Level associated with Burner Management Systems. Identifying the required amount of risk reduction is extremely important especially when evaluating existing legacy Burner Management Systems. Selection of an overly conservative Safety Integrity Level can have significant cost impacts. These costs will either be associated with increased Sa


Identifying Required Safety Instrumented Functions for HIGH-TECH & SEMICONDUCTOR MANUFACTURING
This paper will discuss the issues, decisions, and challenges encountered when attempting to initially apply the concepts of the Safety Life


Implementing Safety Instrumented BMS: Challenges and Opportunities
Implementing a Safety Instrumented Burner Management (SI‐BMS) can be challenging, costly, and time consuming. Simply identifying design shor


Case Study of a Safety Instrumented Burner Management System (SI-BMS)
This paper will cover:
the development of a SIS front end loading package
the project cost savings realized attributed to following the saf


A Database Approach to the Safety Life Cycle
A systematic database approach can be used to design, develop and test a Safety Instrumented System (SIS) using methodologies that are in co


What is Truth? Do SIL Calculations Reflect Reality?
Are random hardware failures the only thing that cause a safety instrumented function (SIF) to fail? What if our assumptions are wrong? What