top of page

Celebrating client success, one challenge at a time.


The PHA Recommendation Playbook | Part 3 | Managing Scheduling and Operational Disruptions
Scheduling and operational disruptions are among the most common barriers to closing PHA recommendations. When safety improvements require outages or process changes, timing becomes the challenge. This article explores how facilities can plan ahead, manage risk, and turn scheduling constraints into long-term operational resilience.


Understanding UL 508A Certified Control Panels | Enabling Safer, More Resilient Industrial Facilities
UL 508A certified control panels give industrial facilities a clear path to safer, code-compliant operation. This article explains what the standard covers, how SCCR is established, what changed in 2025, and why working with a certified panel shop helps reduce risk, streamline inspections, and support long-term maintainability.


Whitepaper: Achieving 84-92% Urgent Alarm Reduction Through Comprehensive Lifecycle Implementation: A Dual-Unit Midstream Case Study
Awarded Best Paper Award at the 2025 TEES Mary Kay O'Connor Process Safety Center-TAMU (MKO) Safety & Risk Conference Abstract November 2025 — Greg Pajak, aeSolutions Senior Specialist, ICA — A midstream facility implemented a systematic alarm rationalization program across two critical units, achieving unprecedented reductions in urgent alarm loads. Unit A reduced urgent alarms from 45% to 7% (84% reduction), while Unit B decreased from 62% to 5% (92% reduction). This paper


Scoping Your Industrial Project: Best Practices for Success
Scoping your industrial project is more than a kickoff step—it’s the foundation for budget, schedule, and long-term success. From aligning stakeholders to pressure-testing assumptions, a dynamic scoping strategy helps prevent costly missteps, manage risks, and keep your project on track from concept to completion.
bottom of page
